Making aluminum rust.
Showing posts with label patina. Show all posts
Showing posts with label patina. Show all posts
Thursday, October 16, 2014
Friday, December 13, 2013
Sunday, December 1, 2013
Traditional Sign
The crane is almost complete. The text portion of the sign was hung last week. Team metal of Scathain personaly installed the sign to ensure perfection. Kate and Chris dominated against sub zero temps and harsh winds.
I hope to get the cog/logo portion finished sometime this week.
I hope to get the cog/logo portion finished sometime this week.
Tuesday, October 29, 2013
Saturday, October 26, 2013
Pizza Man chandelier
This was one of the first projects that I was given creative freedom with the finishing. I wanted the bottle rack to look like it was salvaged from the ashes from the original Pizza Man location.
Its such an honor to work with an object that is so beautifully crafted and designed. We truly have the best resident black smyth at Scathain. Each day I learn something new.
Labels:
A.C. VanGalder,
Amber Van Galder,
Black Smyth,
Milwaukee,
patina,
Pizza Man
Wednesday, October 16, 2013
Gantry Patina
I was given the challenge of working on a gantry crane that is over 100 years old.
The crane was salvaged from a foundry in Beloit Wisconsin. It now stands at a local hotel.
The crane was finished through. A traditional patina process.
Labels:
Amber Van Galder,
Beloit Inn,
Beloit Iron Works,
patina
Subscribe to:
Comments (Atom)
